838 Anaheim
This distinct projects, in collaboration with Lorcan O’Herlihy Architects, FlyAwayHomes, and Integrare, are currently progressing through permitting and design phases. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within permitting / plan check constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework.
Location
Wilmington, CA
Client
FlyAwayHomes
Scope
Provided MEP engineering design and coordination. Prepared permit-ready documentation and supported AHJ plan check responses.
Systems
Mechanical, Electrical, Plumbing
Constraints
Environmental exposure considerations (open-air / rooftop conditions) impacting equipment placement and distribution., Permitting and AHJ plan-check requirements (code compliance and documentation rigor).
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents