838 Anaheim

This distinct projects, in collaboration with Lorcan O’Herlihy Architects, FlyAwayHomes, and Integrare, are currently progressing through permitting and design phases. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within permitting / plan check constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework.

Location

Wilmington, CA

Client

FlyAwayHomes

Scope

Provided MEP engineering design and coordination. Prepared permit-ready documentation and supported AHJ plan check responses.

Systems

Mechanical, Electrical, Plumbing

Constraints

Environmental exposure considerations (open-air / rooftop conditions) impacting equipment placement and distribution., Permitting and AHJ plan-check requirements (code compliance and documentation rigor).

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents