
Village School
A3 Engineering is providing MEP design for Village School’s 54,563 SF temporary elementary campus, an office-to-school conversion following the Palisades Fire. A3 Engineering delivered Mechanical design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.
Location
Santa Monica, CA
Client
OFFICEUNTITLED
Scope
Provided Mechanical engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.
Systems
Mechanical, Electrical, Plumbing
Constraints
Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation).
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Right-sized HVAC and ventilation strategy, Integration with existing building infrastructure

Project Lead
Project Team





