UCSB Fitness Center

This project renovates the UCSB Recreation building’s HVAC system by replacing packaged rooftop units like-for-like to enhance reliability and performance while preserving existing infrastructure compatibility. A3 Engineering delivered Mechanical design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Check Out More Of My Projects

Project Lead

Location

Santa Barbara, CA

Client

UCSB

Scope

Provided Mechanical engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.

Systems

Mechanical

Constraints

Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation)., Environmental exposure considerations (open-air / rooftop conditions) impacting equipment placement and distribution.

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Right-sized HVAC and ventilation strategy, Integration with existing building infrastructure