top of page
BANNERnew.png

The Container Yard TI

The project renovates existing one-story entertainment buildings into over 18,900 SF of office space, including private offices, workstations, conference rooms, breakrooms, and a 2,000 SF mezzanine. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Location

Los Angeles, CA

Client

Analogue Studios

Scope

Provided MEP engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.

Systems

Mechanical, Electrical, Plumbing

Constraints

Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation)., Vertical distribution and coordination impacts due to mezzanine / multi-level program elements.

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Integration with existing building infrastructure

Check Out More Of My Projects

Project Lead

Project Team

bottom of page