top of page
BANNERnew.png

Sushi Samba

This approximately 16,000 SF open-air restaurant project at the 639 LA Peer Building in West Hollywood features a fully enclosed rooftop kitchen and open-air dining areas. A3 Engineering delivered Mechanical, Commercial Kitchen design and coordination, translating the program into permit-ready construction documentation. The team emphasized constructability, field verification, and cross-discipline coordination to minimize conflicts during installation. The scope includes MEP consulting and design services in accordance with the landlord-approved leasing package and tenant programming.

Check Out More Of My Projects

Project Lead

Location

Los Angeles, CA

Client

Sushi Samba Group

Scope

Provided Mechanical engineering design and coordination. Coordinated commercial kitchen ventilation, exhaust, and make-up air requirements.

Systems

Mechanical, Low Voltage, Commercial Kitchen

Constraints

Environmental exposure considerations (open-air / rooftop conditions) impacting equipment placement and distribution., Landlord criteria and leasing-package constraints governing allowable system modifications.

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Right-sized HVAC and ventilation strategy, Kitchen exhaust and make-up air coordination

Project Team

bottom of page