
SkyDio
This project involves a 20,000 SF warehouse infill for Skydio in Hayward, CA. A3 Engineering delivered Mechanical, Electrical design and coordination, translating the program into permit-ready construction documentation. The team emphasized constructability, field verification, and cross-discipline coordination to minimize conflicts during installation. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Project Lead
Location
Hayward, CA
Client
SOP Mechanical
Scope
Provided Mechanical, Electrical engineering design and coordination.
Systems
Mechanical, Electrical
Constraints
Vertical distribution and coordination impacts due to mezzanine / multi-level program elements.
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Right-sized HVAC and ventilation strategy, Code-compliant power and lighting design
Project Team


