top of page
BANNERnew.png

SkyDio

This project involves a 20,000 SF warehouse infill for Skydio in Hayward, CA. A3 Engineering delivered Mechanical, Electrical design and coordination, translating the program into permit-ready construction documentation. The team emphasized constructability, field verification, and cross-discipline coordination to minimize conflicts during installation. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Check Out More Of My Projects

Project Lead

Location

Hayward, CA

Client

SOP Mechanical

Scope

Provided Mechanical, Electrical engineering design and coordination.

Systems

Mechanical, Electrical

Constraints

Vertical distribution and coordination impacts due to mezzanine / multi-level program elements.

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Right-sized HVAC and ventilation strategy, Code-compliant power and lighting design

Project Team

bottom of page