top of page
BANNERnew.png

Meta

This approximately 10,000 SF tenant improvement project at 8600 Melrose in West Hollywood includes gallery space, a sales floor, restrooms, and a mezzanine, to showcase their new venture with Ray-Ban. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within tenant improvement constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Check Out More Of My Projects

Project Lead

Location

West Hollywood, CA

Client

DE-YAN

Scope

Provided MEP engineering design and coordination. Supported tenant improvement planning and integration with base-building services. Developed new utility distribution and equipment layouts for shell-condition space.

Systems

Mechanical, Electrical, Plumbing

Constraints

Tenant improvement scope requiring integration with base-building services and landlord criteria., Shell-condition space requiring new distribution, equipment selection, and utility coordination., Vertical distribution and coordination impacts due to mezzanine / multi-level program elements.

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents

Project Team

bottom of page