
LBCC - Viking Baseball Complex
This project renovates and expands LBCC’s Viking Base-ball stadium, increasing seating to 586 and upgrading facilities. A3 Engineering delivered Electrical design and coordination, translating the program into permit-ready construction documentation. The team emphasized constructability, field verification, and cross-discipline coordination to minimize conflicts during installation. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Project Lead
Location
Long Beach, CA
Client
Long Beach Community College
Scope
Provided Electrical engineering design and coordination.
Systems
Electrical
Constraints
Constructability-driven coordination with architectural and structural constraints., Code-compliant documentation suitable for permitting and contractor pricing.
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Code-compliant power and lighting design
Project Team


