top of page
BANNERnew.png

LBCC - Viking Baseball Complex

This project renovates and expands LBCC’s Viking Base-ball stadium, increasing seating to 586 and upgrading facilities. A3 Engineering delivered Electrical design and coordination, translating the program into permit-ready construction documentation. The team emphasized constructability, field verification, and cross-discipline coordination to minimize conflicts during installation. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

​

Check Out More Of My Projects

Project Lead

Location

Long Beach, CA

Client

Long Beach Community College

Scope

Provided Electrical engineering design and coordination.

Systems

Electrical

Constraints

Constructability-driven coordination with architectural and structural constraints., Code-compliant documentation suitable for permitting and contractor pricing.

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Code-compliant power and lighting design

Project Team

bottom of page