LBCC - Sports Lighting Upgrade

This project involves a sports lighting upgrade for the existing practice football field and tennis courts. A3 Engineering delivered Electrical design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Location

Long Beach, CA

Client

Long Beach Community College

Scope

Provided Electrical engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.

Systems

Electrical, Low Voltage

Constraints

Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation).

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Code-compliant power and lighting design, Integration with existing building infrastructure