LBCC - Sports Lighting Upgrade
This project involves a sports lighting upgrade for the existing practice football field and tennis courts. A3 Engineering delivered Electrical design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.
Location
Long Beach, CA
Client
Long Beach Community College
Scope
Provided Electrical engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.
Systems
Electrical, Low Voltage
Constraints
Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation).
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Code-compliant power and lighting design, Integration with existing building infrastructure