
Jenesse Center
This project was a renovation of a Domestic Violence intervention and prevention center whose primary clients were women and children. A3 Engineering delivered Plumbing, Commercial Kitchen design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Project Lead
Location
Los Angeles, CA
Client
Jenesse Center, Inc.
Scope
Provided Plumbing engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure. Coordinated commercial kitchen ventilation, exhaust, and make-up air requirements.
Systems
Plumbing, Commercial Kitchen
Constraints
Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation).
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Efficient domestic water and sanitary design, Kitchen exhaust and make-up air coordination, Integration with existing building infrastructure, Reduced field conflicts through coordinated layouts
Project Team


