Hawthorne City Hall
This multi-scope project includes a seismic retrofit, renovation, and expansion of a 32,000 SF City Hall, along with a 95,000 SF park. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within tenant improvement, existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Project Lead
Location
Hawthorne, CA
Client
City of Hawthorne
Scope
Provided MEP engineering design and coordination. Supported tenant improvement planning and integration with base-building services. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.
Systems
Mechanical, Electrical, Plumbing
Constraints
Tenant improvement scope requiring integration with base-building services and landlord criteria., Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation).
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Integration with existing building infrastructure
Project Team