Guitar Center
A3 Engineering provided Mechanical, Electrical and Plumbing design for several Guitar Center locations ranging from 12,000sf-20,000sf. Key design elements included extensive coordination with landlord provided equipment, acoustically sensitive rooms with consider-ations for adjacent tenants, and numerous lessonrooms with independent control. The sales floor is designed with optimized lighting and flexible power connections throughout for dynamic utilization of the space.
Various Locations (CA, NY, TX, KS)
Guitar Center
A3 Engineering provided Mechanical, Electrical and Plumbing design for several Guitar Center locations ranging from 12,000sf-20,000sf. A3 Engineering delivered Mechanical, Electrical, Plumbing design and coordination, translating the program into permit-ready construction documentation. The team emphasized constructability, field verification, and cross-discipline coordination to minimize conflicts during installation. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.
Provided Mechanical, Electrical, Plumbing engineering design and coordination.
Mechanical, Electrical, Plumbing, Low Voltage
Project Lead
Landlord criteria and leasing-package constraints governing allowable system modifications.
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Right-sized HVAC and ventilation strategy, Code-compliant power and lighting design, Efficient domestic water and sanitary design, Reduced field conflicts through coordinated layouts

Project Team