Guitar Center
A3 Engineering provided Mechanical, Electrical and Plumbing design for several Guitar Center locations ranging from 12,000 SF-20,000 SF. A3 Engineering delivered Mechanical, Electrical, Plumbing design and coordination, translating the program into permit-ready construction documentation. The team emphasized constructability, field verification, and cross-discipline coordination to minimize conflicts during installation. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Project Lead
Location
Various Locations (CA, NY, TX, KS)
Client
Guitar Center
Scope
Provided Mechanical, Electrical, Plumbing engineering design and coordination.
Systems
Mechanical, Electrical, Plumbing
Constraints
Landlord criteria and leasing-package constraints governing allowable system modifications.
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Right-sized HVAC and ventilation strategy, Code-compliant power and lighting design, Efficient domestic water and sanitary design, Reduced field conflicts through coordinated layouts
Project Team