Gindi Maimonides Academy

This project is the expansion and renovation of the Gindi Academy in West Hollywood, California. The scope includes a 60,000sf ground up classroom building and a 35,000sf gymnasium / sports complex. A3 completed the concept package as part of the entitlements with full design scheduled to start in 2027.

West Hollywood, CA

This project is the expansion and renovation of the Gindi Academy in West Hollywood, California. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. A3 completed the concept package as part of the entitlements with full design scheduled to start in 2027.

Provided MEP engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.

Low Voltage

Project Lead

Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation)., Accelerated design schedule requiring rapid decision-making and tight consultant coordination.

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Integration with existing building infrastructure