
Fullerton College - Softball Stadium
This project renovates Fullerton College’s softball field with new dugouts, concession stands, DSA-approved bleachers, and a home team locker room. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The team emphasized constructability, field verification, and cross-discipline coordination to minimize conflicts during installation.

Project Lead
Location
Fullerton, CA
Client
Fullerton College
Scope
Provided MEP engineering design and coordination.
Systems
Mechanical, Electrical, Plumbing
Constraints
Constructability-driven coordination with architectural and structural constraints., Code-compliant documentation suitable for permitting and contractor pricing.
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents
Project Team


