Burbank Studios - Bachelor
The project entails renovating the existing 4th floor to accommodate the relocation of The Bachelor production team. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Project Lead
Location
Burbank, CA
Client
Warner Brothers Discovery
Scope
Provided MEP engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.
Systems
Mechanical, Electrical, Plumbing
Constraints
Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation).
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Integration with existing building infrastructure
Project Team