top of page
BANNERnew.png

711 New Hampshire

The project is a 100% affordable housing project with a new ground-up tower adjacent to an existing mansion. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Check Out More Of My Projects

Project Lead

Location

Los Angeles, CA

Client

KTGY

Scope

Provided MEP engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.

Systems

Mechanical, Electrical, Plumbing

Constraints

Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation).

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Integration with existing building infrastructure

Project Team

bottom of page