
5950 Jefferson
This project located at 5950 Jefferson Ave in Los Angeles, ca is a tenant improvement for a commercial office space by Carrier Johnson + Culture. A3 Engineering delivered Mechanical design and coordination, translating the program into permit-ready construction documentation. The work was executed within tenant improvement constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Project Lead
Location
Los Angeles, CA
Client
Carrier Johnson + Culture
Scope
Provided Mechanical engineering design and coordination. Supported tenant improvement planning and integration with base-building services.
Systems
Mechanical
Constraints
Tenant improvement scope requiring integration with base-building services and landlord criteria.
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Right-sized HVAC and ventilation strategy
Project Team


