
2919 Wilshire
This project is a new ground-up multi-family development with eight stories above grade and four levels of subterranean parking. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within tenant improvement constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.
Location
Santa Monica, CA
Client
Cypress Equity Investments
Scope
Provided MEP engineering design and coordination. Supported tenant improvement planning and integration with base-building services. Developed new utility distribution and equipment layouts for shell-condition space.
Systems
Mechanical, Electrical, Plumbing
Constraints
Tenant improvement scope requiring integration with base-building services and landlord criteria., Shell-condition space requiring new distribution, equipment selection, and utility coordination.
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents

Project Lead
Project Team


