2120 Remodel KNBC_KVEA
The project is a refresh of the existing corridors and restrooms. A3 Engineering delivered Mechanical, Electrical, Plumbing design and coordination, translating the program into permit-ready construction documentation. The work was executed within existing conditions constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Project Lead
Location
Universal City, CA
Client
NBC Universal
Scope
Provided Mechanical, Electrical, Plumbing engineering design and coordination. Performed existing-conditions verification and coordinated tie-ins to existing infrastructure.
Systems
Electrical, Mechanical, Plumbing
Constraints
Existing-conditions verification and tie-ins to existing infrastructure (field survey / as-built validation).
Outcomes
Coordinated MEP design aligned with architectural intent, Permit-ready construction documents, Right-sized HVAC and ventilation strategy, Code-compliant power and lighting design, Efficient domestic water and sanitary design, Integration with existing building infrastructure