1598 University

The project is a new high-rise mixed use multi-family building consisting of 8 floors with 1 level of subterranean parking. A3 Engineering delivered MEP design and coordination, translating the program into permit-ready construction documentation. The work was executed within tenant improvement constraints, with focused field verification and multidisciplinary coordination to reduce RFIs and rework. The resulting systems strategy balanced performance, code compliance, and lifecycle cost while supporting the architectural intent.

Location

Berkeley, CA

Client

Volumetic Building Companies

Scope

Provided MEP engineering design and coordination. Supported tenant improvement planning and integration with base-building services.

Systems

Mechanical, Electrical, Plumbing

Constraints

Tenant improvement scope requiring integration with base-building services and landlord criteria., Mixed-use context requiring careful separation of services and coordination with adjacent occupancies.

Outcomes

Coordinated MEP design aligned with architectural intent, Permit-ready construction documents